Early 2015, Zhou Yunjie, chairman of the board of ORG Technology Co., LTD. set the theme for the annual work: "Change", put forward the requirement of "change thinking, change action" to senior management of the group, and called on everyone to have a clear understanding of the macro, view the micro, combined with the company's strategic goal of "becoming a renowned provider of comprehensive packaging solutions in the world", and formulate action strategies. Shen Tao, President of ORG, further clarified in his work report that "all factories should build standardized, regular, normal and efficient modern factories to promote lean manufacturing!
In June 2015, in order to innovate management thinking and practice scientific management methods, the standardized lean production project (i.e. "OJT Project") was officially launched, and the goal of "building standard chemical plant, implementing lean management, and increasing efficiency by 50% in five years" was set.
By June 2020, this goal has been achieved. Recently, as an editor, I interviewed three people in charge of OJT project, so that we can better understand the project.
What changes have brought to ORG in five years of lean management?
Tao Shen, President, OJT Project Leader, ORG:

During the five years of lean management, the company has undergone several changes. The first is the shift from heavy-assets to light-assets. Secondly, marketing ideas, from the relationship type to the platform type transformation. The third shift is from business to efficiency. In the process of implementation, the first is to truly achieve full participation, breaking the boundaries of the organization. Second, mechanism optimization and results sharing. A good mechanism is an important guarantee for promoting change. Third, we should seek truth from facts. Instead of applying theory to practice, we should observe and think about problems through practice, and combine theory to find solutions that are truly suitable for us.
How is the lean operations system of ORG set up?
Chen Yin, General Manager, Personnel Administration Center, OJT Project Vice leader:

1. Do a good job in top-level design, system planning, rolling perfect path
At the beginning of the project, the group's leading group had a profound perspective: efficiency improvement cannot be separated from three upgrades: ①Standard upgrade. Revise and optimize the business standards; ②Personnel ability upgrade. Transform the standard course-ware, carry out OJT, and strengthen the technical skill training of staff; ③Industrial engineering upgrade of the factory. To carry out the optimization of factory industrial engineering, we need to establish a set of systems that are complementary to each other.
2. Simple in depth, easy design to learn, easy to implement the project method.
Development and implementation of the OJT four-step approach(①Say to him;②Do it to him;③Ask him to do it himself;④Feedback and encouragement),Because of its simplicity and comprehensiveness, the OJT mass movement was able to spread quickly and in full force.
3. Through the establishment of systems and mechanisms, let lean management from project to business normalization.
Three sets of system(The first set:Incentive system;The second set:The training work of the factory will be imported into OJT system;The third set:Awards management honor, culture spur system)the management of the import make the lean work normalization.
What are the achievements and experiences in the implementation of OJT project?
Chen Zhongge, Vice President of ORG, General Manager of Three-piece Tank Business Unit and Deputy Leader of OJT Project:

In June 2015, the lean production project was officially launched in Hubei Company. At the same time, we want to drive Beijing, Anhui, Abao and Longkou to implement this policy, aiming to improve efficiency by 50% in five years. In support of this goal, the team worked together to set and achieve several sub-project goals. Through technical transformation, quality improvement, efficiency improvement, energy saving and consumption reduction in total of more than 300 improvements, it achieved an average increase of 1.83% of the first pass rate; By optimizing the layout of the production line, reforming the equipment and consolidating the positions, the total number of employees was reduced by 24.45%. In order to ensure the implementation of OJT project, we have trained 358 OJT lecturers, 34 backbone lecturers and 21 coach lecturers and developed nearly 3000 training course-ware after the training and assessment certification of the Human Resources Department of the group. These are our most valuable experience and resources.

The practice of lean production in the main factory for 5 years proves that lean management plays an important role in building ORG manufacturing advantage, promoting enterprising and innovative enterprise spirit, and cultivating talent team!